All of the drywall has been installed throughout the entire bathrroom. The electrical and plumbing has also been installed. Once we finish mudding the dryall and laying the ceramic tile we can install the sink and vanity.
This is a photo of the bifold doors that hide the furnace and hot water tank on the other side of the hallway.
No comments:
Post a Comment