The electrical portion of the project has also been started. There has been an electrical outlet installed behind the wall which supports the wall hung macerating toilet. This is to supply power to the toilet.
There are two junction boxes installed where we will have wall sconce lighting fixtures installed on each side of the mirror. The vanity will be below.
No comments:
Post a Comment